Cost Allocation in Multipurpose Projects — Study Resources & PYQs
Cost allocation in multipurpose projects
- Estimated study time: 67 minutes
Study resources
- An analysis of the separable costs – remaining benefits method of joint cost allocation (SCRB method) (PDF) — Detailed critical analysis of the Separable Costs-Remaining Benefits (SCRB) method - the standard technique for allocating joint costs among multipurpose project purposes.
- July 2015 Final Cost Allocation Appendix (real-world worked example of separable and joint cost allocation) (PDF) — Real-world numerical example of separable and joint cost calculation and allocation by remaining benefits for an actual multipurpose water project.
Cost Allocation in Multipurpose Projects previous year questions
Taught in these subjects
- Water Resource Engineering — CCE-6702 · Government College of Engineering and Technology, Jammu