Scour Depth — Study Resources & PYQs
Determination of scour depth
- Estimated study time: 41 minutes
Study resources
- Module20120 - Phase IV/VI: Linear waterway, scour depth, afflux, backwater effect (PDF) — Module20120 - Phase IV/VI: Linear waterway, scour depth, afflux, backwater effect — selected for the syllabus topic Scour Depth.
- NPTEL — Transportation Engineering I, IIT Bombay (Article) — NPTEL course covering highway engineering, geometric design, sight distance, horizontal/vertical alignment and pavement materials and design.
Taught in these subjects
- Highway Engineering — CEP-6604 · Government College of Engineering and Technology, Jammu