Analysis of Rates — Study Resources & PYQs
Analysis of rates for construction items
- Estimated study time: 80 minutes
Study resources
- Analysis of Rates – Detailed Breakdown (Article) — Govt. Polytechnic lecture slides: cost of material, labour, T&P, carriage, contractor's profit with brick masonry example.
- Analysis of Rates for Building Works (Article) — Covers rate analysis purpose, preparing rates for concrete, masonry, plaster, tile, and paint items with overhead.
Taught in these subjects
- Estimation & Costing — CEP-6504 · Government College of Engineering and Technology, Jammu