Subheads — Study Resources & PYQs
Subheads used in estimation
- Estimated study time: 44 minutes
Study resources
- Single & Double Room Estimate – Numericals (Article) — Practice questions and answers on estimate of single and double room buildings with worked volume calculations.
- Analysis of Rates – Materials, Labour & Overhead (Article) — Covers overhead costs, labour required, contractor's profit (10%), T&P (2.5-3%), water charges, and carriage costs.
Taught in these subjects
- Estimation & Costing — CEP-6504 · Government College of Engineering and Technology, Jammu