Production Planning and Control 2018 Question Paper — Government Coll…
The 2018 Production Planning and Control previous year question paper (Government College of Engineering and Technology, Jammu), with every question and its marks.
- University: Government College of Engineering and Technology, Jammu
- Subject: Production Planning and Control
- Course: Production Planning & Control
- Branch: Mechanical Engineering
- Year: 2018
- Paper: end-term
- Duration: 180 minutes
- Total marks: 100
Instructions
- Attempt five questions in all selecting at least two questions from each Section.
- Each question carries 20 marks.
- Assume any missing data.
- Use of calculator is allowed.
Questions
SECTION-A
- QQ1.. (a).Distinguish between production planning and production control and state their objectives? [10] (b).Explain the importance of PPC department in a typical production system? [10] [20 marks]
- QQ2.. (a) Define routing and its significance. Explain about the important components of routing sheets? [10] (b). Using the method of least squares, find the trend values for each five years for the annual sales data given below. Also estimate the annual sales for the year 1985. [10] | Year | 1980 | 1981 | 1982 | 1983 | 1984 | |---|---|---|---|---|---| | Sales in Rs | 50000 | 65000 | 750000 | 52000 | 72000 | [20 marks]
- QQ3.. (a).Describe dispatching control in intermittent production and continuous production? [15] (b).Enumerate any five differences between loading and scheduling? [5] [20 marks]
- QQ4.. Define inventory. What are the various types of inventory? Why are they maintained? [20] [20 marks]
SECTION-B
- QQ5.. What are the stages involved in project planning and implementation? [20] [20 marks]
- QQ6.. (a). Solve the following transportation problem by North West corner rule? [10] | | $F_1$ | $F_2$ | $F_3$ | Supply | |---|---|---|---|---| | $W_1$ | 2 | 7 | 4 | 5 | | $W_2$ | 3 | 3 | 1 | 8 | | $W_3$ | 5 | 4 | 7 | 7 | | $W_4$ | 1 | 6 | 2 | 14 | | Demand | 7 | 9 | 18 | | (b). Make a Left hand and Right hand operation chart for filling ink in a fountain pen? [10] [20 marks]
- QQ7.. (a). Find out the standard time using the following data Average time for machine element = 12min, Average time for manual elements = 8 min, Performance rating = 120%, Allowances = 8% [10] (b). What are the objectives of Work Study? Describe briefly? [10] [20 marks]
- QQ8.. Write short notes [4*5=20] (i). Rating (ii). Standard time (iii). Work sampling (iv). Fatigue Allowance [20 marks]