(a) A road actually 2660 m long was found to be 2652 m when measured…
Previous year question for Essentials of Civil Engineering.
Question
(a) A road actually 2660 m long was found to be 2652 m when measured with a defective 30 m chain. How much correction does the chain need? (10)
(b) What are the various tape corrections that are involved during the field measurement? Explain any two of them. (05)
- Year: 2022
- Subject: Essentials of Civil Engineering