Design a suitable cross drainage work using the data given below: Can…
Previous year question for Design of Hydraulic Structures.
Question
Design a suitable cross drainage work using the data given below:
Canal:
Full supply level = 2135 m
Full surface discharge = 32 cumecs
Canal bed level = 212 m
Canal bed width = 20 m
Trapezoidal canal section = 1.5 : 1
Drainage :
High flood depth = 2.5 m
High flood level = 210 m
High flood discharge = 300 cumecs
General ground level = 212.5 m
- Year: 2018
- Subject: Design of Hydraulic Structures