(a) Design a septic tank for 125 persons, estimated peak discharge is…

Previous year question for Waste Water Engineering.

Question

(a) Design a septic tank for 125 persons, estimated peak discharge is $300\text{ lpm}$. Also design design the soil absorption system for the disposal of the septic tank effluent, assuming the percolation rate as 20 min. per cm.

(b) Enumerate the advantages and disadvantages of Imhoff tanks.

Related pages

Open on CachedInfo