Batch Window Design — Roadmap Step & Resources
Choosing batch frequency and size for a given workload
- Level: beginner
- Estimated time: 1 days
- Roadmap: ETL/ELT Pipeline Engineering
Before this step
Study resources
- dbt Documentation (Article) — Official documentation for dbt, covering transformation, testing and project structure. Background reading/viewing for: Batch Window Design.
- Apache Airflow Documentation (Article) — Official documentation on scheduling batch processing jobs. Relevant to: Batch Window Design.
Part of
- Batch Processing Patterns — section
- ETL/ELT Pipeline Engineering roadmap — the full learning path